{"id":191,"date":"2022-06-16T23:08:17","date_gmt":"2022-06-16T22:08:17","guid":{"rendered":"http:\/\/garbothan.com\/?p=191"},"modified":"2022-06-18T07:22:43","modified_gmt":"2022-06-18T06:22:43","slug":"week-two-part-two","status":"publish","type":"post","link":"https:\/\/garbothan.com\/index.php\/2022\/06\/16\/week-two-part-two\/","title":{"rendered":"Week Two &#8211; Part Two"},"content":{"rendered":"\n<p>On Wednesday we had a meeting with Andrew to discuss scheduling the next part of the build as it seemes like the questions from building control have been resolved and the warrant is likely be issued soon. <\/p>\n\n\n\n<p>The main decisions we are being asked to make are about the groundworks and the <a rel=\"noreferrer noopener\" href=\"https:\/\/www.isoquick.co.uk\" target=\"_blank\">Isoquick<\/a> foundation <a href=\"https:\/\/en.wikipedia.org\/wiki\/Floating_raft_system\" target=\"_blank\" rel=\"noreferrer noopener\">raft.<\/a> If we are going to deal with it ourselves, with the help of family and friends, there will be a lot of logistics to deal with and some technically demanding marking out of the plot, all of which makes us anxious. <\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"777\" src=\"http:\/\/garbothan.com\/wp-content\/uploads\/2022\/06\/Screenshot-2022-06-16-at-22.06.41-1024x777.png\" alt=\"\" class=\"wp-image-192\" srcset=\"https:\/\/garbothan.com\/wp-content\/uploads\/2022\/06\/Screenshot-2022-06-16-at-22.06.41-1024x777.png 1024w, https:\/\/garbothan.com\/wp-content\/uploads\/2022\/06\/Screenshot-2022-06-16-at-22.06.41-300x228.png 300w, https:\/\/garbothan.com\/wp-content\/uploads\/2022\/06\/Screenshot-2022-06-16-at-22.06.41-768x583.png 768w, https:\/\/garbothan.com\/wp-content\/uploads\/2022\/06\/Screenshot-2022-06-16-at-22.06.41-1536x1166.png 1536w, https:\/\/garbothan.com\/wp-content\/uploads\/2022\/06\/Screenshot-2022-06-16-at-22.06.41-1568x1190.png 1568w, https:\/\/garbothan.com\/wp-content\/uploads\/2022\/06\/Screenshot-2022-06-16-at-22.06.41.png 1758w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption>Plan of the plot with the house, workshop and elements of the groundworks.<\/figcaption><\/figure>\n\n\n\n<p>Looking at the plan and discussing all the different elements with Andrew was difficult to understand. We would also have to meet with Scottish Water to discuss the water connection, SSEN to discuss and oganise the mains power connection, organise the digging of service trenches, laying of pipes, the <a href=\"https:\/\/marshindustries.co.uk\/products\/ensign-sewage-treatment-plants\/\" target=\"_blank\" rel=\"noreferrer noopener\">sewage treatment plant<\/a> &#8211; as you can imagine this is a lot for us to take on being amateurs and inexperienced to boot.<\/p>\n\n\n\n<p>If we appoint a groundworks contractor we can take more of a backseat but Andrew will have to supervise the preparation of the Isoquick insulation and concrete raft.<\/p>\n\n\n\n<p>On Wednesday we continued by making the third panel for the north elevation  and managed to make the first panel for the west elevation, which got us round the first corner of our building with one wall complete. Lifting the panels onto the stack is getting a lot more challenging as they are getting very heavy and we needed Andrew&#8217;s help to lift GF4.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"769\" src=\"http:\/\/garbothan.com\/wp-content\/uploads\/2022\/06\/DSC_0029-1024x769.jpg\" alt=\"\" class=\"wp-image-197\" srcset=\"https:\/\/garbothan.com\/wp-content\/uploads\/2022\/06\/DSC_0029-1024x769.jpg 1024w, https:\/\/garbothan.com\/wp-content\/uploads\/2022\/06\/DSC_0029-300x225.jpg 300w, https:\/\/garbothan.com\/wp-content\/uploads\/2022\/06\/DSC_0029-768x577.jpg 768w, https:\/\/garbothan.com\/wp-content\/uploads\/2022\/06\/DSC_0029.jpg 1438w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption>This panel has a lot of extra studs in it because of the internal walls that will attach to it ,making it very heavy to lift onto the stack.<\/figcaption><\/figure>\n\n\n\n<p>Today, Thursday, is the last day of the week for building as we are heading to Edinburgh to see our family and some friends tomorrow, so we need to get on with it. We have managed to make panels GF5, the final panel for the west elevation, and GF6 which is the panel with our bedroom window. So now we have all the panels for two elevations and have turned two corners of the building.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"728\" src=\"http:\/\/garbothan.com\/wp-content\/uploads\/2022\/06\/IMG_1876-1024x728.jpg\" alt=\"\" class=\"wp-image-196\" srcset=\"https:\/\/garbothan.com\/wp-content\/uploads\/2022\/06\/IMG_1876-1024x728.jpg 1024w, https:\/\/garbothan.com\/wp-content\/uploads\/2022\/06\/IMG_1876-300x213.jpg 300w, https:\/\/garbothan.com\/wp-content\/uploads\/2022\/06\/IMG_1876-768x546.jpg 768w, https:\/\/garbothan.com\/wp-content\/uploads\/2022\/06\/IMG_1876-1536x1092.jpg 1536w, https:\/\/garbothan.com\/wp-content\/uploads\/2022\/06\/IMG_1876-2048x1456.jpg 2048w, https:\/\/garbothan.com\/wp-content\/uploads\/2022\/06\/IMG_1876-1568x1115.jpg 1568w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption>The panel frame with the window aperture and Molly giving the thumbs up in it for scale, a decent sized window..<\/figcaption><\/figure>\n\n\n\n<h2 class=\"has-text-align-center wp-block-heading\">Sheeting with OSB<\/h2>\n\n\n\n<p>In the picture above you can see the panel frame before it has been sheeted with OSB. The OSB gives the panel more structural strength and allows moisture to pass through which helps to prevent the build up of moisture in the building. This is how we do it.<\/p>\n\n\n\n<div class=\"wp-block-columns alignwide are-vertically-aligned-top is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-vertically-aligned-top is-layout-flow wp-block-column-is-layout-flow\">\n<h3 class=\"wp-block-heading\">Measuring<\/h3>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"737\" height=\"982\" src=\"http:\/\/garbothan.com\/wp-content\/uploads\/2022\/06\/DSC_0035-edited.jpg\" alt=\"\" class=\"wp-image-200\" srcset=\"https:\/\/garbothan.com\/wp-content\/uploads\/2022\/06\/DSC_0035-edited.jpg 737w, https:\/\/garbothan.com\/wp-content\/uploads\/2022\/06\/DSC_0035-edited-225x300.jpg 225w\" sizes=\"auto, (max-width: 737px) 100vw, 737px\" \/><\/figure>\n\n\n\n<p>Each sheet of OSB has to be cut to fit the frame, usually in 600mm sections but sometimes we need to measure where to cut out an apertuure such as a window or door. Each sheet of OSB has to have a gap before the next one is attached to allow for the wood to expand in hot weather.<\/p>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-vertically-aligned-top is-layout-flow wp-block-column-is-layout-flow\">\n<h3 class=\"wp-block-heading\">Cutting<\/h3>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" src=\"http:\/\/garbothan.com\/wp-content\/uploads\/2022\/06\/IMG_1868-1024x768.jpg\" alt=\"\" class=\"wp-image-201\" srcset=\"https:\/\/garbothan.com\/wp-content\/uploads\/2022\/06\/IMG_1868-1024x768.jpg 1024w, https:\/\/garbothan.com\/wp-content\/uploads\/2022\/06\/IMG_1868-300x225.jpg 300w, https:\/\/garbothan.com\/wp-content\/uploads\/2022\/06\/IMG_1868-768x576.jpg 768w, https:\/\/garbothan.com\/wp-content\/uploads\/2022\/06\/IMG_1868-1536x1152.jpg 1536w, https:\/\/garbothan.com\/wp-content\/uploads\/2022\/06\/IMG_1868-1568x1176.jpg 1568w, https:\/\/garbothan.com\/wp-content\/uploads\/2022\/06\/IMG_1868.jpg 2016w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p>The OSB has to be cut to size, here we are using a guide to help us cut a straight line. At other times we use a jig saw, a multitool or a circular saw without the guide to cut out windows and doors.<\/p>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-vertically-aligned-top is-layout-flow wp-block-column-is-layout-flow\">\n<h3 class=\"wp-block-heading\">Nailing<\/h3>\n\n\n\n<p>Once we are happy with a board we put a few nails in place to hold it then go onto the next sheet. Once all yhe sheets have been attached we have to go round the panel making sure that there are nails every 150mm around the edge of the panel, around windows or doors and along studs 600mm apart<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"769\" height=\"1024\" src=\"http:\/\/garbothan.com\/wp-content\/uploads\/2022\/06\/DSC_3701-769x1024.jpg\" alt=\"\" class=\"wp-image-202\" srcset=\"https:\/\/garbothan.com\/wp-content\/uploads\/2022\/06\/DSC_3701-769x1024.jpg 769w, https:\/\/garbothan.com\/wp-content\/uploads\/2022\/06\/DSC_3701-225x300.jpg 225w, https:\/\/garbothan.com\/wp-content\/uploads\/2022\/06\/DSC_3701-768x1023.jpg 768w, https:\/\/garbothan.com\/wp-content\/uploads\/2022\/06\/DSC_3701.jpg 1080w\" sizes=\"auto, (max-width: 769px) 100vw, 769px\" \/><\/figure>\n<\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>On Wednesday we had a meeting with Andrew to discuss scheduling the next part of the build as it seemes like the questions from building control have been resolved and the warrant is likely be issued soon. The main decisions we are being asked to make are about the groundworks and the Isoquick foundation raft.&hellip; <a class=\"more-link\" href=\"https:\/\/garbothan.com\/index.php\/2022\/06\/16\/week-two-part-two\/\">Continue reading <span class=\"screen-reader-text\">Week Two &#8211; Part Two<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[13,14,7,17,15,12,9,11,8,16,10],"class_list":["post-191","post","type-post","status-publish","format-standard","hentry","category-buildinggarbothan","tag-andrew-scott","tag-argyll-homes","tag-garbothan","tag-groundworks","tag-low-energy-house","tag-molly-drysdale","tag-passivhaus","tag-peter-ross","tag-self-build","tag-sheeting-with-osb","tag-timber-frame","entry"],"_links":{"self":[{"href":"https:\/\/garbothan.com\/index.php\/wp-json\/wp\/v2\/posts\/191","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/garbothan.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/garbothan.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/garbothan.com\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/garbothan.com\/index.php\/wp-json\/wp\/v2\/comments?post=191"}],"version-history":[{"count":9,"href":"https:\/\/garbothan.com\/index.php\/wp-json\/wp\/v2\/posts\/191\/revisions"}],"predecessor-version":[{"id":208,"href":"https:\/\/garbothan.com\/index.php\/wp-json\/wp\/v2\/posts\/191\/revisions\/208"}],"wp:attachment":[{"href":"https:\/\/garbothan.com\/index.php\/wp-json\/wp\/v2\/media?parent=191"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/garbothan.com\/index.php\/wp-json\/wp\/v2\/categories?post=191"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/garbothan.com\/index.php\/wp-json\/wp\/v2\/tags?post=191"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}